Before adding a second format, draw the complete route from incoming empties to dispatch for both lines. Identify which equipment uses shared utilities and which traffic crosses the other line. Include access for an operator, warehouse movement and agreed service work.
Check the brewery layout at peak conditions
Use the expected simultaneous schedules alongside each line’s footprint. Ask the integrator to indicate the points where one line depends on the other. Keep clear ownership of existing and added modules.
| Interface | Can line | Bottle line |
|---|---|---|
| Arrival of empty packages | ___ | ___ |
| Shared supply and packaging services | ___ | ___ |
| Finished pack route | ___ | ___ |
| Maintenance or forklift access | ___ | ___ |
Walk the plan using a peak-hour example. If one line needs a pallet of empties every 15 minutes and the other dispatches one finished pallet every 12, mark both trips around the point where they coincide. A conflict at a single forklift door can force staggered runs even when both machines fit the building.
Check installation and handling on the brewery floor
Review both brewery lines in context
Send a measured layout, containers, line rates and simultaneous uses.